Project Description: Adaptive re-use of the Cathedral Barn (204) for public assembly
Project Type: Commercial
Project Manager: Ray Kendra, AIA
Start Date: 2006-06-01
Estimated Completion Date: 2009-07-01
A3.1 Base Bid Floor Plans_preliminary_2-9-09.pdf
A3.2 Alternate Lower Level Floor Plan_preliminary_2-9-09.pdf
Barns204 concept_10-23-08.pdf
A1.2 Lower Level Floor Plan Concept_2-9-09.pdf
A1.3 Main Level Floor Plan Concept_2-9-09.pdf
A6.1 Exterior Elevations_preliminary_2-9-09.pdf
A6.2 Elevations and Buildin Sections_preliminary_2-9-09.pdf